09/04/2026
9/3/2026
Happened to be at the right place at the time to capture the last blade being attached to the hub of T28. This is number 6 of 51 GE 6.1-158 turbines on the Coles Wind project that is fully assembled.
Living within the project footprint gives me more opportunities to capture parts of the construction process. If there is something you want me to show more of, leave a comment or message me.