09/01/2026
Welp - yβall, I didnβt meet my goal of being done with the studio by end of August π₯² the flooring is taking us a little bit longer than I thought it would. BUT - itβs superrrrr super close to being done. About 25% left of the flooring to do.
Then final touches with the baseboards and framing the windows/doors which should be able to be done in the same day! So my bet is that the studio will be done by the end of this weekend!! ππΌπ€πΌ
With that being said, I deleted my fall mini session I posted the other day π
Iβll be posting a new one with a new date soon. So keep an eye out! π