Outer Banks,North Carolina

Website

Outer Banks,North Carolina �

Hallowen 🎃🎃🎃
10/30/2026

Hallowen 🎃🎃🎃

Just wash your dishes 🙏
10/29/2026

Just wash your dishes 🙏

Once elected I will become vegetarian 🇺🇸
10/28/2026

Once elected I will become vegetarian 🇺🇸

Go Nicki 👏👏👏
10/27/2026

Go Nicki 👏👏👏

🙏🙏
10/27/2026

🙏🙏

**OFFICIAL ANNOUNCEMENT**Temporary Ferry Transportation Service Now in OperationWhile repairs and reconstruction of the ...
10/26/2026

**OFFICIAL ANNOUNCEMENT**

Temporary Ferry Transportation Service Now in Operation
While repairs and reconstruction of the damaged roadway are underway, temporary ferry transportation services are now operational to maintain access between Hatteras Island and the mainland.

The ferry service will operate between **Pea Island and the Marc Basnight Bridge area**, with an estimated crossing time of just **2 minutes**.

**All ferry rides are completely FREE** for both residents and visitors.

My morning view 😍
10/26/2026

My morning view 😍

A large protest by Airbnb hosts has stretched along the Outer Banks towns after Airbnb officials introduced new rules an...
10/24/2026

A large protest by Airbnb hosts has stretched along the Outer Banks towns after Airbnb officials introduced new rules and restrictions.

Due to the destroyed section of Highway 12, NCDOT has decided to build the new roadway closer to the ocean—for even bett...
10/23/2026

Due to the destroyed section of Highway 12, NCDOT has decided to build the new roadway closer to the ocean—for even better ocean views.

Dare County announces a proposed major infrastructure initiative aimed at preventing future highway washouts and improvi...
10/22/2026

Dare County announces a proposed major infrastructure initiative aimed at preventing future highway washouts and improving long-term transportation safety along North Carolina Highway 12 (NC 12).

Under the proposed plan, a new elevated coastal bridge would be constructed to bypass sections of NC 12 that are particularly vulnerable to ocean overwash, severe coastal storms, flooding, and shoreline erosion.

The proposed bridge would extend over the ocean before reconnecting with the existing highway, providing a more resilient transportation route for residents, visitors, emergency services, and local businesses.

**Estimated Project Cost:** Approximately $12 billion

**Proposed Construction Start:** January 2027

Address

5230 North Croatan Highway
Duck, NC
27948

Alerts

Be the first to know and let us send you an email when Outer Banks,North Carolina posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share