15/06/2026
Let’s get ready to rumble. At least two years of production of concrete blocks for the breakwater repairs. Huge machinery clunking and clanging every day. Morawelon residents, as well as those in Bolsach will bear the brunt of the dust and noise.
Apparently it’s a cert. No planning required.
ruling the roost.