DroneArt Media

DroneArt Media Capturing content through the eye of a drone! Certified Drone Operator

Check out my latest 🎥👇
17/06/2026

Check out my latest 🎥👇

🌾 Bute Silo Art — Yorke Peninsula, South AustraliaDiscover the vi...

Bute’s iconic silo mural brings a burst of colour on the Yorke Peninsula — the Bute Silo Art celebrates regional women, ...
17/06/2026

Bute’s iconic silo mural brings a burst of colour on the Yorke Peninsula — the Bute Silo Art celebrates regional women, local wildlife, and the spirit of country SA. Award‑winning, vibrant, and unmissable.

Australian Silo Art Trail

Marine & Harbours Hotel, Port AdelaideThe iconic 1978 Marine & Harbours building is being reborn as Port Adelaide’s newe...
13/06/2026

Marine & Harbours Hotel, Port Adelaide

The iconic 1978 Marine & Harbours building is being reborn as Port Adelaide’s newest boutique destination. Blending retro charm with bold brutalist architecture, the Marine & Harbours Hotel will offer spacious rooms, riverfront suites, rooftop views, and a warm, nostalgic design that celebrates the Port’s maritime heritage. A landmark transformed for a new era on the waterfront.

The building’s well‑known Wonderwalls mural is planned to be retained and restored, with the developers in contact with the original artists.

Dock One, Port Adelaide I Kite

T2D Southern Construction Precinct - May 2026 Update🏗️The first and second TBM cutterheads have been lowered into the 20...
23/05/2026

T2D Southern Construction Precinct - May 2026 Update🏗️

The first and second TBM cutterheads have been lowered into the 20m deep Southern Precinct launch box at Clovelly Park and are currently being assembled and will soon be tasked with carving out the twin Southern Tunnels, excavating through soil and rock on the 4.5km journey towards Glandore and Black Forest.

https://www.t2d.sa.gov.au/

Torrens to Darlington Project

T2D Southern Construction Precinct - April 2026 Update🏗️ – First TBM Cutterhead LiftSouth Australia’s biggest infrastruc...
19/04/2026

T2D Southern Construction Precinct - April 2026 Update🏗️ – First TBM Cutterhead Lift

South Australia’s biggest infrastructure project — the $15.4 billion Torrens to Darlington (T2D) upgrade — has reached a major milestone. The first of three 300‑tonne Tunnel Boring Machine cutterheads has now been lifted into the Southern Precinct launch box at Clovelly Park.

This marks a major step toward building the Non‑Stop South Road, with the Australian and South Australian governments each contributing $7.7 billion to the project.

Crews have already excavated more than 343,000 tonnes of material to form the 120m x 50m x 20m launch box where the first two TBMs are being assembled. These mega machines will soon begin carving the 4.5 km Southern Tunnels, while a third TBM will take on the 2.2 km Northern Tunnels.

Tunnelling is expected to begin in the second half of 2026, with each TBM operating 24/7 and progressing around 8–10 metres per day.

https://www.t2d.sa.gov.au/

Torrens to Darlington Project

Absolutely stoked to have some of my recent Torrens to Darlington Project (T2D) drone work featured on Season 2026 Episo...
10/04/2026

Absolutely stoked to have some of my recent Torrens to Darlington Project (T2D) drone work featured on Season 2026 Episode 5 of Channel 9's Building Ideas program.

See story from 19m:05sec

Check out my latest 🎥👇
31/03/2026

Check out my latest 🎥👇

Steamtown in Peterborough is one of South Australia’s most distinctive heritage railway sites — a place where the state’s rail history, engineering grit, and...

Address

Adelaide, SA

Website

Alerts

Be the first to know and let us send you an email when DroneArt Media posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share