10/31/2026
Colorado River Fire celebrated the topping out of the new Station 61 in Silt Thursday morning. Shaw Construction put together an entire event with the beam signing, lifting, raffle prizes, and lunch. The new station was built in the pre-existing parking lot of the station on east side where they will connect the existing apparatus bays to complete the station. Once move-in ready crews will move over and the old living quarters will be torn down.
https://www.cwfirephoto.com/Fire-Events/ST61-Top-Out