20/10/2026
αα½ααΆααΈ Brand QA ααΊααΆαα»ααααα·αQAααααΆαααααααα½ααα»αααααΌαααΎ BrandααΆαα½ααααα―αααΆααα αααααΆααα
αΆααααΆααααΈααα½α Order β Sample β Production β Final Inspection β Audit Documentationα
αα·ααΆαααΆαααααΆαααΆααα»αααΆαααααBrandααΆαα½αα
1. Received Order & Requirement Confirmation
β’ ααα½α PO/Order Sheet, Tech Pack, Size Chart, Packaging Guideline, Wash Standard
β’ αα·αα·αααα―αααΆαααΆααα’ααα²ααααΆαααααΉαααααΌα αα»αα
αΆααααααΎαααΆαααΆα
2. Pre-Production Meeting (PPM)
β’ α
αΌααα½α PPM ααΆαα½α Merchandising, Production, Cutting, Sewing, Finishing
β’ αααα αΆα Risk Points, workmanship concern, trims concern
β’ αααααΆαααααααΌαααΆαα’ααααα·α (Buyer Requirement)
3. PP Sample / TOP Sample Review & Approval
β’ αα·αα·ααα PP Sample (Pre-production sample)
β’ αα·αα·ααα TOP Sample (Top of Production)
β’ ααααααααααΆα Tech Pack, Measurement, Workmanship, Trims, Packaging
β’ αααααΆαα Approved Sample
4. First Output Quality Checking
β’ αα·αα·ααα First Output (First 5β10 pcs)
β’ αααααΆαα workmanship, measurement, construction, trims
β’ αααααααΆαααααΆαα¬αααααααΌαααααΆαα
5. Inline Quality Monitoring
β’ ααΆαααΆααα»αααΆαα
αΆααααΈ Material Inspection, Cutting, Sewing, Washing, Ironing, Finishing
β’ αααααααααα α»α Indentify Defect
β’ αα ααΆαααΆαα½α QC/Supervisor ααΎααααΈαααααααΌαααα α»αααΆααα’αα defect
6. Final Inspection Coordination
β’ αααα
α Final Inspection (Internal / Buyer / Third Party)
β’ ααααα Approved Sample, Size Set, Packaging Standard
β’ αααα½ααα·αα·ααα AQL αα·αααΆαααΆααααααααα
7. Documentation & Audit File Keeping
β’ αααααΆαα»α QA Report, Defect Record, Final Inspection Report, Approved Sample Record
β’ αααα
αα―αααΆααααααΆαα Buyer Audit / Internal Audit
α’ααααααααααααα: SAM Creator
#ααΌαααΆαAI